241 Lincoln Road, Addington

13 February 2021
A4DE8CFB 63E5 42CD A0B3 9B192D0A2B53

Demolition, earthworks and civil construction

Our client constructed a 20 unit development with carparking and external landscaping. Our scope of works included: 

  • Demolition of existing dwellings and general site clearance
  • Bulk excavation around driven timber piles
  • Foundation basecourse
  • Construction of 150mm thick concrete car park and paths
  • Construction of permeable paved car parking area
  • Kerb and channel/ V- channel
  • Timber retaining walls
  • Line marking, wheel stops
  • Vehicle crossing

Project achievements

  • Due to the location of the site, we undertook careful operational planning and engaged extensive traffic management to safely manage truck movements. 

  • Existing dwellings were close to the boundary which meant careful safety considerations were required to reduce risk and damage to neighbouring properties. 

 

 